Semimonthly

ISSN 1000-1026

CN 32-1180/TP

+Advanced Search 中文版
Comprehensive Optimal Scheduling Model for Integration of Power Generation and Consumption Considering Network Constraints
Author:
Affiliation:

1. China Electric Power Research Institute(Nanjing), Nanjing 210003, China; 2. Shenergy(Group)Co. Ltd., Shanghai 201100, China

Abstract:

Integration of flexible and controllable load resources into power system scheduling and operation will increase the risk of grid congestion, and pose new challenges to power system dispatching regulation ability. The traditional power grid eliminates congestion mainly through capacity-increase, load transfer and orderly power utilization. With the upgrading of the interactive capabilities of “source-grid-load”, flexible loads participating in grid scheduling plays a very cost-effective role in solving grid congestion problems. Based on flexible loads involved in demand response scheduling, a comprehensive optimal scheduling model for integration of power generation and consumption considering network constraints is developed to make comprehensive benefits of interaction maximum. By forming the optimal pricing and incentive scheme, the model realizes coordinated scheduling of the integration of power generation and consumption. On the basis of effectively mitigating grid congestion, it has optimized the satisfaction and interaction costs. The optimization model is proved economical and effective with the example of an IEEE14-node system.

Keywords:

Foundation:

Get Citation
[1]WANG Gang, DONG Yihua, WANG Ke, et al. Comprehensive Optimal Scheduling Model for Integration of Power Generation and Consumption Considering Network Constraints[J]. Automation of Electric Power Systems,2017,41(14):105-111. DOI:10.7500/AEPS20161228006
Copy
Share
History
  • Received:December 28,2016
  • Revised:April 28,2017
  • Adopted:February 09,2017
  • Online: April 18,2017
  • Published: