半月刊

ISSN 1000-1026

CN 32-1180/TP

+高级检索 English
实景替代式特高压直流保护系统现场性能测试方案
作者:
作者单位:

1. 国网江苏省电力有限公司电力科学研究院, 江苏省南京市 211103; 2. 国家电力调度控制中心, 北京市 100031;3. 国网江苏省电力有限公司, 江苏省南京市 210029; 4. 江苏凌创电气自动化股份有限公司, 江苏省镇江市 212009

作者简介:

通讯作者:

基金项目:

国家自然科学基金资助项目(51707090);国家电网公司科技项目“特高压直流控制保护系统现场测试及运维优化关键技术研究与应用”(5210EF180013)


Live-action Substitution Based Field Performance Test Scheme for UHVDC Protection System
Author:
Affiliation:

1. Electric Power Research Institute of State Grid Jiangsu Electric Power Co. Ltd., Nanjing 211103, China; 2. National Electric Power Dispatching and Control Center, Beijing 100031, China; 3. State Grid Jiangsu Electric Power Co. Ltd., Nanjing 210029, China; 4. Jiangsu LingChuang Electric Automation Co. Ltd., Zhenjiang 212009, China

Fund Project:

  • 摘要
  • |
  • 图/表
  • |
  • 访问统计
  • |
  • 参考文献
  • |
  • 相似文献
  • |
  • 引证文献
  • |
  • 资源附件
    摘要:

    目前,工程现场调试或运维阶段缺乏能够有效开展特高压直流保护系统功能、性能测试的技术手段。文中提出了实景替代式的特高压直流保护系统现场性能测试方案,研制了特高压直流保护系统现场测试装置。利用特高压直流保护系统现场测试装置的不同硬件接口实现被测特高压直流保护系统在物理环境上的实景替代;通过多源数据同步输出、数字量多协议输出、分布式多机同步、故障录波回放等关键技术,实现被测特高压直流保护系统在运行环境上的实景替代。现场应用结果表明,所提出的实景替代式特高压直流保护系统现场性能测试方案能够对特高压直流保护系统的功能、性能开展有效的现场测试。

    Abstract:

    There is no effective method to test the functions and performances of ultra-high voltage direct current(UHVDC)protection system in debugging or operation and maintence stage of engineering field. The live-action substitution based field performance test scheme for UHVDC protection system is proposed. Moreover, the corresponding test device of UHVDC protection system is developed. The various hardware interfaces of the UHVDC protection test device are employed to lively substitute the hardware environment of the tested UHVDC protection system. The key technologies including synchronous output of multi-source signals, output of digital signals with multi-protocol, distributed multi-device synchronization and replaying of fault recording data are developed to ensure the live-action substitution of the operational environment of tested UHVDC protection system. The field application indicates that the proposed live-action substitution based test scheme for UHVDC protection system can effectively test the functions and performances for UHVDC protection system.

    参考文献
    相似文献
    引证文献
引用本文

孔祥平,李鹏,阮思烨,等.实景替代式特高压直流保护系统现场性能测试方案[J].电力系统自动化,2019,43(13):139-146. DOI:10.7500/AEPS20180411006.
KONG Xiangping, LI Peng, RUAN Siye,et al.Live-action Substitution Based Field Performance Test Scheme for UHVDC Protection System[J].Automation of Electric Power Systems,2019,43(13):139-146. DOI:10.7500/AEPS20180411006.

复制
分享
文章指标
  • 点击次数:
  • 下载次数:
  • HTML阅读次数:
  • 引用次数:
历史
  • 收稿日期:2018-04-11
  • 最后修改日期:2019-05-17
  • 录用日期:2019-03-21
  • 在线发布日期: 2019-05-14
  • 出版日期: